Linking a Simulation to a Scenario Step

  1. In the Project Explorer, under Scenarios, select the scenario containing the step to link to a simulation. The Scenario Designer appears.
  2. Select the step in the diagram.
  3. Access the Details window, and then click the Scenario generic step bar.
  4. Above Links to simulation, click Configure. The Choose a simulation to connect to this step dialog box appears.
  5. Select the simulation to link to, and then click Save & Close. The scenario step updates with a simulation icon to indicate a simulation is linked to the step. When running a scenario storyboard, you are given the option to run the linked simulation.