Enabling Testing Tool Integration

Note: This procedure can only be performed by Project administrators.

Project administrators can use the following procedure to enable testing tool integration.

Note: You need to have a testing tool connector (such as the Silk Central Connector) running in Micro Focus Connect for test information to be sent to Atlas.

Watch how to do it: Changing Default Values.

  1. Log in with Project Administrator credentials.
  2. Click (Home).
  3. Choose a Project from the Available Projects list.
  4. Click Admin Tools.
  5. Click the Defaults tab.
  6. Click Test Integration.
  7. Click Enabled.
  8. Use Graph Duration (days) to configure how long of a time span for which you want to see test results. These are displayed in the Requirement Tracking Tab.
  9. Click Save and close Admin Tools.