Generating Plan Review Reports

The Plan Review Report contains information for Plans that have not been pushed to an Agile tool. These are Plans that are still being developed.

  1. Choose a Project from the Available Projects list.
  2. Click Report.
  3. Select Plan Review.
  4. Choose the Plan from the Plan list.
  5. Check or un-check the information to include in the Report:
    Attribute
    Includes the User Defined Attributes for the Requirement.
    Relationships
    Includes a list of the items related to each Requirement.
    Tags
    Includes the Tags associated with the Requirements.
    Discussions
    Includes the Discussion threads associated with each Requirement.
    Delivery Tracking
    Includes the tracking status.
    System Attributes
    Includes system attributes.
    Page Breaks
    Creates page breaks between Micro Focus Atlas artifacts, such as Requirements and Stories.
    Test Overview
    Includes a test results overview table if test integration is enabled by the system administrator or project administrator.
  6. Optional: Choose a Time Label from the list to run a comparison of the current state to the Time Label state. Labels created after the plan was created display in the list.
  7. Click Generate. The Report is generated as a DOCX file and your browser provides the option to open or save the file.

Plan Review Report Example

The Plan Review Report contains a cover page and a table of contents. The cover page contains the Plan name, Project name, the type of Report, who generated the Report, and the date the Report was generated.

The body of the Report appears as:

The remainder of the Report lists the associated Requirements, displayed the same as in the Requirement Report.

The Plan Review Comparison report shows changes in Test Overview, User Attributes, Relationships, Tags, and Delivery Status.

The cover page displays the label name and the date and time of the label, indicating that the report is a comparison.

The table of contents contain indicators for how sections have changed:
CHG
Changed
UNC
Unchanged
DEL
Deleted
ADD
Added
Note: The report does not show Project Name changes or Project Description changes.

UDAs, Tags, and Requirements display changes with strikethrough text.

Descriptions show changes with comparisons and highlighted text.

Relationships display removed relationships with strikethrough and new relationships in bold.

Delivery Tracking displays all deleted items at the end of the report.